Toronto, ON, Canada
2008-2009
Project Manager and Supervising Engineer for the preliminary design of five new road bridges and two footbridges in the Lower Don Lands, representing $200M of this $700M redevelopment of an old industrial site in Toronto, Canada, for MVVA and Waterfront Toronto. Managed a team of engineers and architects, coordinated with the client, and assisted with the design.
Client: MVVA and Waterfront Toronto
Engineer and Architect: RFR
Images: RFR, MVVA
Click here for the development web site.