Boston, MA, USA
2002-2006
Lead Structural Engineer for construction support of approximately 5,500 ft (1,700m) of segmental precast post-tensioned concrete box girder bridges for the Central Artery/Tunnel project for the Massachusetts Highway Department in Boston, MA, USA. Reviewed contractor submittals and requests for information and occasional shop drawings. Assisted with the resolution of construction problems and disputes. Performed calculations and coordinated other designers as needed.
Client: Massachusetts Highway Department
Engineer: BergerABAM
Images: BergerABAM, Louis Berger Group